🏛️ Florida Permit Guide for Contractors

Everything you need to know about pulling permits in Florida — HVAC, electrical, roofing, and plumbing. Fees, requirements, and licensing rules for all major cities.

Check My Florida Permit Requirements Free →

📋 Florida Permit Overview

DetailInfo
NEC Edition2020
IRC Edition2021 (Florida Building Code)
Permit AuthorityStatewide Florida Building Code — very strictly enforced
Statewide CodeYes
Licensing Boardhttps://www.myfloridalicense.com

⚠️ Key Things to Know About Permitting in Florida

  • Florida Building Code is among the strictest in the US — post-Hurricane Andrew legacy
  • Hurricane-rated products required in HVHZ (High Velocity Hurricane Zone): Broward and Miami-Dade counties
  • Wind mitigation reports affect insurance — often requested at permit
  • Roofing: specific nail patterns (6d vs 8d), specific underlayment requirements by wind zone
  • HVAC: CAC license required statewide. Strong enforcement.
  • All permits must be recorded and easily accessible to inspectors
  • Permit cards must be posted at job site
  • Solar: PE stamp often required. Strong market.
  • Generator: standby generators common — setback requirements strict

📍 Cities in Florida — Permit Guides

📍 Miami

Miami-Dade County Regulatory and Economic Resources (RER) or City of Miami Building Department

📍 Tampa

City of Tampa Construction Services Division

📍 Orlando

Orange County Building Division

📍 Jacksonville

City of Jacksonville Building Inspection Division (BID)

📍 Fort Lauderdale

City of Fort Lauderdale Development Services Division

Check Any Florida City Permit in 5 Seconds

Our AI searches live building department data for every city and county in Florida.

Run a Free Permit Check →